{"id":47,"date":"2011-11-06T09:41:34","date_gmt":"2011-11-06T09:41:34","guid":{"rendered":"http:\/\/epsconsultant.com.np\/?p=47"},"modified":"2018-10-23T06:13:14","modified_gmt":"2018-10-23T06:13:14","slug":"details-of-completed-projects","status":"publish","type":"post","link":"http:\/\/www.epsconsultant.com.np\/?p=47","title":{"rendered":"Details of Completed Projects"},"content":{"rendered":"<table border=\"1\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\">S.N<\/td>\n<td valign=\"top\"><strong>Name of the Project\/ (Consulting Services)<\/strong><\/td>\n<td valign=\"top\"><strong>Name of the Client<\/strong><\/td>\n<td valign=\"top\"><strong>Year of Completion<\/strong><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1<\/td>\n<td valign=\"top\">Detail Survey, Design &amp; Preparation of Estimate of following W\/S Projects<\/p>\n<ul>\n<li>Muderi W\/S Project, Tankisunuwari<\/li>\n<li>Urlabari Campus WSP, Urlabari<\/li>\n<li>Haraicha WSP, Su.Bi<\/li>\n<li>Kanepokhari W\/S Project<\/li>\n<li>Sundardulari W\/S Project<\/li>\n<li>Kuwapani WSP Su. Bi<\/li>\n<li>Jhorahat WSP Su.Bi<\/li>\n<li>Darbesa WSP<\/li>\n<li>Patigaon 2<sup>nd<\/sup> WSP<\/li>\n<li>Kuwapani Chulipskhari WSP<\/li>\n<li>Sisapani Jahada 1,2,3,4 Pumping W\/S Projectr<\/li>\n<\/ul>\n<p>&nbsp;<\/td>\n<td valign=\"top\">DWSS, Water Supply &amp; Sanitation Division Office Biratnagar, Morang<\/td>\n<td valign=\"top\">2075<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2<\/td>\n<td valign=\"top\">Business Plan Preparation of Existing Water Supply Projects<\/p>\n<ul>\n<li>Bhokundebesi WSP, Kavrepalanchowk<\/li>\n<li>Vijayabasti WSP, Parsa<\/li>\n<li>Mujung WSP, Palpa<\/li>\n<li>Dhainbungkot WSP, Rasuwa<\/li>\n<\/ul>\n<p>&nbsp;<\/td>\n<td valign=\"top\">DWSS, Maintenance &amp; Rehabilitation Section,Panipokhari, Kathmandu<\/td>\n<td valign=\"top\">2074\/75<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">3<\/td>\n<td valign=\"top\">Survey Study of Smart City for Birendranagar Municipality of Karnali Province<\/td>\n<td valign=\"top\">Ministry of Physical Infrastructure Development, Karnali Province, Birendranagar, Surkhet<\/td>\n<td valign=\"top\">2074\/75<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">4<\/td>\n<td valign=\"top\">Topographic Survey of Balkhu River Corridor (Triveni Ghat Chandragiri to 4 Km downstream Ch 0+000-Ch 4+000)<\/td>\n<td valign=\"top\">KVDA, District Commissioner\u2019s Office,Kathmandu<\/td>\n<td valign=\"top\">2074\/75<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">5<\/td>\n<td valign=\"top\">Preparation of DPR for Marpha Village protection works and Plantation at Gharapjong Rural Municipality, ward no:2<\/td>\n<td valign=\"top\">Office of Rural Municipality Executive, Gharapjong Rural Municipality<\/td>\n<td valign=\"top\">2074\/45<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">6<\/td>\n<td valign=\"top\">Preparation of DPR for Protection of trail road and staircase of Jomsom View tower Gharapjong Ruralmunicipality Ward no 4 &amp; 5<\/td>\n<td valign=\"top\">Office of Rural Municipality Executive, Gharapjong Rural Municipality<\/td>\n<td valign=\"top\">2074\/45<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">7<\/td>\n<td valign=\"top\">Detailed Engineering Survey and Design of Thada JukenaJaluke Lamatal Badidamar Bhalubang Road (Ch 20+000 to<\/p>\n<p>31+500) of Sitganga Municipality, Arghakhanchi<\/td>\n<td valign=\"top\">Office of Sitganga Municipality, Thada, Arghakhanchi<\/td>\n<td valign=\"top\">2074\/75<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">8<\/td>\n<td valign=\"top\">Preparation of V-WASH Plan of Shikha VDC, Piple VDC, &amp; Pakha VDC<\/td>\n<td valign=\"top\">Rural water\u00a0 Supply atrd-Sanitation\u00a0 project in westem\u00a0 Nepal, phase II(RWSSP-WN II) , District Development\u00a0 Committee,\u00a0 Myagd<\/td>\n<td>\n<p align=\"center\">2072<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">9<\/td>\n<td valign=\"top\">Business Plan Preparation of Existing Water Supply Projects:i)\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ramechhap WSP, Ramechhap Municipality-7,8, Ramechhap District<\/p>\n<p>ii)\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 ii)Chisapani WSP, Manthali Municipality-8, Ramechhap District<\/p>\n<p>iii)\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Indrapur WSP, Sundarharaicha Municipality-10, Morang District<\/p>\n<p>iv)\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Letang WSP, Letang Municipality-2,3,4,5,6, Morang District<\/p>\n<p>v)\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Chandraayodhyapur WSP,\u00a0 Naraha village Municipality-3 &amp; Golbazar Municipality, Siraha District<\/p>\n<p>vi)\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Chandranigahapur WSP,\u00a0 Chandranigahapur Municipality-4,5,6, Rauthat District<\/p>\n<p>vii)\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Wangala WSP, Sandhikharka Municipality-4,5, Argakhanchi District<\/p>\n<p>viii)\u00a0\u00a0\u00a0\u00a0\u00a0 Kindala WSP, Sandhikharka Municipality-8,2, Argakhanchi District<\/p>\n<p>&nbsp;<\/td>\n<td valign=\"top\">GoN, Ministry of Water Supply &amp; Sanitation , Department of Water Supply &amp; Sewerage, (Maintenance &amp; Rehabilitation Section)<\/td>\n<td>\n<p align=\"center\">2073<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">10<\/td>\n<td valign=\"top\">Detail survey and Report Preparation of Pokhara, Dhankuta, Dhalkebar, Pyuthan and Dang for rain water harvesting<\/td>\n<td valign=\"top\">GoN, Ministry of Physical Planning and works, Department of water supply and sewerages. Rain water Harvesting &amp; Appropriate Technology Development Section,<\/td>\n<td>\n<p align=\"center\">2066<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">11<\/td>\n<td valign=\"top\">Detail Engineering Survey, Design and cost estimate of\u00a0 Byas Water supply &amp; sanitation Project Sudhar Bistar &amp; Ghattekhola Shikhar-4, Water Supply &amp; Sanitation Project<\/td>\n<td valign=\"top\">Water Supply &amp; Sanitation Sub Division office, Darchula<\/td>\n<td>\n<p align=\"center\">2070\/71<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">12<\/td>\n<td valign=\"top\">Detail Engineering Study, Survey, Estimate and Report Preparation of Babiyachaur Water supply and sanitation Project and Devisthan Water Supply and Sanitation Project<\/td>\n<td valign=\"top\">Water Supply &amp; Sanitation Sub Division office, Myagdi, Beni<\/td>\n<td>\n<p align=\"center\">71\/72<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">13<\/td>\n<td valign=\"top\">Detail Engineering Study, Survey, Estimate and Report Preparation of Jyamrukot-Arjam-Ratnechaur Water Supply and Sanitaion Project and Darbang Water Supply Project<\/td>\n<td valign=\"top\">Water Supply &amp; Sanitation Sub Division office, Myagdi, Beni<\/td>\n<td>\n<p align=\"center\">072\/73<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">14<\/td>\n<td valign=\"top\">Detail Engineering Study &amp; Design of Bobang Water Supply Project<\/td>\n<td valign=\"top\">Water Supply &amp; Sanitation Division office, Baglung<\/td>\n<td>\n<p align=\"center\">072\/73<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">15<\/td>\n<td valign=\"top\">Detail Engineering Survey, Design &amp; Estimate of Halpu Khola Water Supply Project &amp; Taman Water Supply Project<\/td>\n<td valign=\"top\">Water Supply &amp; Sanitation Division office, Baglung<\/td>\n<td>\n<p align=\"center\">2071\/72<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">16<\/td>\n<td valign=\"top\">Detail Engineering Survey, Design &amp; Estimate of Phalamkhani Water Supply Project &amp; Kalokhola Chitepani Water Supply Project<\/td>\n<td valign=\"top\">Water Supply &amp; Sanitation Division office, Parbat<\/td>\n<td>\n<p align=\"center\">2070\/71<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">17<\/td>\n<td valign=\"top\">Detail Engineering Study, Survey, Design, Estimate and Report Preparation of<\/p>\n<ul>\n<li>Biratnagar Sahari WSP, Biratnagar Metro Politan city<\/li>\n<li>Jhurkiya WSP, Ratuwamai Municipality<\/li>\n<li>Damravitta WSP, Ratuwamai Municipality<\/li>\n<li>Salakpur WSP, Sundar Haricha Municipality<\/li>\n<li>Damravitta WSP, Ratuwamai Municipality<\/li>\n<li>Gobindapur WSP, Ratuwamai Municipality<\/li>\n<\/ul>\n<\/td>\n<td valign=\"top\">Water Supply &amp; Sanitation Division office, Morang, Biratnagar<\/td>\n<td>\n<p align=\"center\">2073\/74<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">18<\/td>\n<td valign=\"top\">Detail Engineering Study, Survey, Estimate and Report Preparation of<\/p>\n<ul>\n<li>Gizyan WSP<\/li>\n<li>Shaligram Chappa W\/S Project<\/li>\n<\/ul>\n<p>&nbsp;<\/td>\n<td valign=\"top\">Water Supply &amp; Sanitation Division office, Kusma, Parbat<\/td>\n<td>\n<p align=\"center\">2072\/73<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">19<\/td>\n<td valign=\"top\">Detail Engineering Study, Survey, Estimate and Report preparation of Jhang Surkaypakha WSSP<\/td>\n<td valign=\"top\">Water Supply &amp; Sanitation Division office, Kusma, Parbat<\/td>\n<td>\n<p align=\"center\">2071\/72<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">20<\/td>\n<td valign=\"top\">Detail Engineering Study, Design &amp; Preparation of various water supply ProjectsBhagabati, 8-5, Simalpani-3,4, Dharapai Chidika Pipalneti, Arghatose-4, Chhahare Khola Thulichaur lift, Kerunga-3,5 w\/s project<\/td>\n<td valign=\"top\">Water Supply &amp; Sanitation Division office, Arghakhanchi<\/td>\n<td>\n<p align=\"center\">2071\/72<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">21<\/td>\n<td valign=\"top\">Detail Survey ,Cost Estimate and preparation of report for various Rain Water Harvesting Projects (Viz. Dang-1, Rolpa-3)<\/td>\n<td valign=\"top\">GoN, Ministry of Physical Planning and works, Department of water supply and sewerages. Rain water Harvesting &amp; Appropriate Technology Development Section,<\/td>\n<td>\n<p align=\"center\">2068<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">22<\/td>\n<td valign=\"top\">Detail Structural Analysis on DDC Building , Chainpur, Bajhan<\/td>\n<td valign=\"top\">GoN, Ministry of Local Development , Office of District Development Committee, Chainpur, Bajhang<\/td>\n<td>\n<p align=\"center\">2067<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">23<\/td>\n<td valign=\"top\">Feasibility study, Detail Engineering Survey, Soil Investigation , Hydrological Study , Detail Engineering Design and Estimate of Rodi Khola Bridge, Markoi chowk, Khaireni , Prithvi Rajmarga, under contract No: BP-6650-DSD-068\/069-36<\/td>\n<td valign=\"top\">GoN, Ministry of Physical Planning and works, Department Of Road, , Bridge Project<\/td>\n<td>\n<p align=\"center\">2069<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">24<\/td>\n<td valign=\"top\">Soil investigation and Preparation of Report for Ncell Tower of\u00a0 different sites<\/td>\n<td valign=\"top\">Zamil India Infrastructure Pvt. Ltd<\/td>\n<td>\n<p align=\"center\">2069<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">25<\/td>\n<td valign=\"top\">Analysis of stability of structure of existing Building for placing Solar Panels<\/td>\n<td valign=\"top\">Zamil India Infrastructure Pvt. Ltd<\/td>\n<td>\n<p align=\"center\">2069<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">26<\/td>\n<td valign=\"top\">Detail Survey &amp; Report Preparation of Rain Water Harvesting Model Project (Baitadi, Baglung, Gorkha and Ilam)<\/td>\n<td valign=\"top\">GoN, DWSAS, Rainwater Harvesting Section<\/td>\n<td>\n<p align=\"center\">2069<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">27<\/td>\n<td valign=\"top\">Detail Survey on Water Induce Disaster Management Project at Kinja, Kharikhola, Solukhumbu<\/td>\n<td valign=\"top\">GoN, Water Induce Disaster Management, Division Office No:2, Janakpur<\/td>\n<td>\n<p align=\"center\">2069<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">28<\/td>\n<td valign=\"top\">Preparation of Tourism Development Master Plan of Chhimkeshwori Area<\/td>\n<td valign=\"top\">GoN, DUDBD, Division Office Gorkha<\/td>\n<td>\n<p align=\"center\">2069<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">29<\/td>\n<td valign=\"top\">Monitoring of Health Building Projects in Central Development Region<\/td>\n<td valign=\"top\">GoN, DUDBC, Babarmahal, Kathmandu<\/td>\n<td>\n<p align=\"center\">2069<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">30<\/td>\n<td valign=\"top\">Detail Survey and Design of Bheri khola Trail Bridge at Bhagwati-9, Siuan, and Thulabagar Trail Bridge (Bheri Nadi) at Dada gaun of Jajarkot District<\/td>\n<td valign=\"top\">GON, DoLIDAR, Suspension Bridge Division, Shreemahal, Pulchowk, Lalitpur<\/td>\n<td>\n<p align=\"center\">2069<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">31<\/td>\n<td valign=\"top\">Soil Investigation and Preparation of Soil Investigation Report of Multi Storied Building for Gaur Municipality<\/td>\n<td valign=\"top\">Office of Gaur Municipality, Gaur, Rautahat<\/td>\n<td>\n<p align=\"center\">2069<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">32<\/td>\n<td valign=\"top\">Detail Feasibility Study (Morphological) Report- (40 Km), Balithum-7 &amp; 8, Gulmi<\/td>\n<td valign=\"top\">Department of Water Induced Disaster Prevention, River Training Project, Pulchowk, Lalitpur<\/td>\n<td>\n<p align=\"center\">2070<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">33<\/td>\n<td valign=\"top\">IEE of Chormara-Kolhuwa Road of Sahid Alok Chakrapath (Ch: 0+000 to 8+100) Under Rural Access Improvemnet Decentralization Project<\/td>\n<td valign=\"top\">District Development Committee, Parasi, nawalparasi<\/td>\n<td>\n<p align=\"center\">2070<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">34<\/td>\n<td valign=\"top\">Structural &amp; Febrication Drawing along with BOQ &amp; Structural Stability test of PP Structure, Truss Shade and Hopper<\/td>\n<td valign=\"top\">Unilever Nepal Ltd, Basamadi-5, Makwanpur<\/td>\n<td>\n<p align=\"center\">2071<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">35<\/td>\n<td valign=\"top\">Structural Design and Cost Estimate of Roof Trussing and Roofing over the Administrative Building in Bhairahawa (SEZ)<\/td>\n<td valign=\"top\">Special Economic Zone Dev. Committee, Babarmahal, Kathmandu<\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">36<\/td>\n<td valign=\"top\">Detailed Engineering Survey, Detail Drawing of Yak Khola LSTB Bridge and Dhey Khola LSTB Bridge, Surkhang, Mustang<\/td>\n<td valign=\"top\">DDC, Mustang<\/td>\n<td>\n<p align=\"center\">2071<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">37<\/td>\n<td valign=\"top\">Detail Survey for Upgrading Nisibhuji Janata Campus- Buspark Road, Burtibang VDC, Baglung District<\/td>\n<td valign=\"top\">DUDBC Division Office, Baglung<\/td>\n<td>\n<p align=\"center\">2071<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">38<\/td>\n<td valign=\"top\">Survey &amp; Design of Panchanagar- Maheshpur Road (7 Km ) In Nawalparasi District<\/td>\n<td valign=\"top\">DDC Nawalparasi<\/td>\n<td>\n<p align=\"center\">2071<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">39<\/td>\n<td valign=\"top\">Detail Engineering Survey, Study, Design &amp; Cost Estimate of Gajari Water Supply &amp; Sanitation Project at gajari VDC, Doti<\/td>\n<td valign=\"top\">DWSS, Regional Monitoring &amp; Supervision Office, Rajpur, Doti<\/td>\n<td>\n<p align=\"center\">2071<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">40<\/td>\n<td valign=\"top\">Detail Engineering Survey, Design, Cost Estimate &amp; Preparation of Bid Documents of Nepaltar-Gaidakhor Ghyankathumka (8Km) road Alignment in Udayapur District<\/td>\n<td valign=\"top\">Depaetment of Mines &amp; Geology<\/td>\n<td>\n<p align=\"center\">2071<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>S.N Name of the Project\/ (Consulting Services) Name of the Client Year of Completion 1 Detail Survey, Design &amp; Preparation of Estimate of following W\/S Projects Muderi W\/S Project, Tankisunuwari Urlabari Campus WSP, Urlabari Haraicha WSP, Su.Bi Kanepokhari W\/S Project Sundardulari W\/S Project Kuwapani WSP Su. Bi Jhorahat WSP Su.Bi Darbesa WSP Patigaon 2nd WSP Kuwapani Chulipskhari WSP Sisapani Jahada 1,2,3,4 Pumping W\/S Projectr &nbsp; DWSS, Water Supply &amp; Sanitation<a href=\"http:\/\/www.epsconsultant.com.np\/?p=47\">&nbsp;&nbsp;[ Read More ]<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"http:\/\/www.epsconsultant.com.np\/index.php?rest_route=\/wp\/v2\/posts\/47"}],"collection":[{"href":"http:\/\/www.epsconsultant.com.np\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.epsconsultant.com.np\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.epsconsultant.com.np\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.epsconsultant.com.np\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=47"}],"version-history":[{"count":3,"href":"http:\/\/www.epsconsultant.com.np\/index.php?rest_route=\/wp\/v2\/posts\/47\/revisions"}],"predecessor-version":[{"id":273,"href":"http:\/\/www.epsconsultant.com.np\/index.php?rest_route=\/wp\/v2\/posts\/47\/revisions\/273"}],"wp:attachment":[{"href":"http:\/\/www.epsconsultant.com.np\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=47"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.epsconsultant.com.np\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=47"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.epsconsultant.com.np\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=47"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}